Critical Path ~ Jules #writephoto

When Lee, Sam, Gerry and Cain got to the barn and made it to the second level – Sam tapped Lee on softly on her shoulder pointing to the hypethral (building with no roof) within the north west corner. It took Lee a few moments to realize that the intensity of sunlight was drawing out the shadows where a piece of a tree limb was scratching at some unseen itch of that interior wall. The three men leveraged the limb up and eased it to lay down across that section of the floor where thankfully nothing had been stored. And there it lay like a silent stone sentinel.

Continue reading at Jules Pens Some Gems

Unknown's avatar

About Sue Vincent

Sue Vincent was a Yorkshire born writer, esoteric teacher and a Director of The Silent Eye. She was immersed in the Mysteries all her life. Sue maintained a popular blog and is co-author of The Mystical Hexagram with Dr G.M.Vasey. Sue lived in Buckinghamshire, having been stranded there due to an accident with a blindfold, a pin and a map. She had a lasting love-affair with the landscape of Albion, the hidden country of the heart. Sue  passed into spirit at the end of March 2021.
This entry was posted in photo prompt, Photography. Bookmark the permalink.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.